OUR PROJECTS :
- Survey of 65 kms. of National Highway for four laning between Beharampur and Farakka section of NH-34 under Hindustan Construction Company (HCC) Pvt. Ltd. The job involved detailed route survey with the application of GIS Technology.
- Route Survey for 250 Kms under ICT Pvt. Ltd. in various states of India including West Bengal, Orissa, Rajasthan, Gujarat, Etc. Our speed & accuracy in a very strict time schedule gained a lot of appreciation from our clients.
- Carrying out co- ordinated Topographical survey, showing all the topographical features by taking spot levels (25M X 25M grid) with a contour interval of 0.5 M of the entire area of Bengal Shriram Hi- Tech City township covering 314 acres at Hindmotor, Hoogly.
- Carrying out Topographical Land Survey for 3x 660 MW Bijor thermal power project at Bijor, Madhya Pradesh. The scope of worl included carrying out topographical survey & contour survey,mapping of surveyed areas, digitization of revenue maps and submission of drawings.
- Conducting Hydrographic survey of reservoir for NHPC Limited of Rangit Power Station. This job included Conducting Hydrographic & Topographical survey of the reservoir, preparation of cross_sections from Dam axis to the tail of the reservoir, extending on both the banks 5 M above FRL including control survey. The spot levels were taken at an interval of 10 /5 M or less as per change in ground profile.
- Deployment of survey team in BALCO smelter project for precision checking of preconcrete & post concrete stages and assisting in day to day survey work. Overall scope included setting out co-ordinates, establishment of benchmarks at various points etc as per direction of engineer - in - charge.
- Confirmatory survey of RCC bridges at different locations in Agartala, PWD(R&B) Tripura for SIMPLEX PROJECTS LTD. The services included confirmatory topographical survey including cross - sections Long-sections, checking levels of TBM pillars, confirmation of HFL, survey of approach roads & proposed alignments.
- Deployment of survey teams for general survey work of mining project at Lanjigarh Dist. Kalahandi, Orissa under VEDANTA ALUMINIUM LTD.The work covered surveying, checking ,demarcation of facilities area, crusher location & mining lease area.
- Survey of 2000 km of rural roads and pathways under PMGSY scheme in Tripura State for NBCC and HSCL. The job involved about 1500 km of new alignment and 500 km of upgradation.Days after days our surveyors worked in closed coordination with security personnel in remote areas coupled with adverse working conditions.
- Conducting land survey, Zirat Survey and preparation of LAP for 109 Kms in connection with construction of New BG line from Byrnihat to Shillong under N.F. Railway. Being one of the most challenging jobs, it includes high precision for mapping land acquisition data and maintaining formal procedures of approval in the rugged terrain of Meghalaya.
- Detailed Survey and Soil Investigation of 618 Kms in North-Eastern Region including the States of Assam, Meghalaya, Arunachal Pradesh under CES(India) Pvt. Ltd. by using Modern Survey Techniques like Satellite Imageries, Total Stations, GPS etc. for various Transmission lines associated with "Comprehensive Scheme for Transmission System Strengthening in North Eastern Region". It included fixation of preliminary route alignment extensive detailing, BOQ preparation and DPR submission.
- Gas Pipe Line survey for about 30km of length under Oil and Natural Gas Corporation Limited (ONGC), Tripura was carried out by our experienced survey engineers where the shortest route was clearly demarcated within a short span of time and was highly appreciated by our clients. In this project,digitization and super imposition of our drawings on the cadastral maps was a special task for preparation of land acquisition plan which was completed quiet smoothly.
- Topographial survey of "SASAN POWER PLANT" in Madhya Pradesh under Reliance. It covered an area of about 4500 Hect. in four parts namely Main Plant, Township, Ash Pond, R&R Colony. Survey has been carried out with DGPS, Total Station, and Digital Auto Level.
- Survey of 1200 km rural roads and pathways under P.M.G.S.Y scheme in Bihar for IL&FS for new connectivity. These projects provide connectivity across 10 districts in Bihar. Our survey team earned huge reputations for speedy and accurate completion of the job and timely delivery.
- Survey of 165 km state highways in Assam under S.M.E.C. Pty. Ltd. It covered 6 packages expanding across 4 districts like Udalguri, Goalpara, etc. The job involved making Bench Mark with DGPS followed by Level transfer and thereafter detailing with Total Station.
- Survey of 225 km state highway in Arunachal Pradesh. It provided connectivity across areas like Passighat, Pangin, Koyu, Ego, etc. It was a challenging opportunity to work in rugged terrain & hostile environment.
- Coal conveyor route surveying of about 100 km in Lanjigarh & Sasan under Vedanta & Reliance.
- Survey of cities located in Agartala, Imphal and Dimapur. These surveys were carried out for development of drainage and sewerage disposal system nd details of all roads were incorporated. Conducting survey in these regions were a challenge as it was located in the densely populated regions of North East recording very heavy rainfall. Extensive use of GPS was made for transferring the levels and coordinates on each road at an interval of about 200m.
- Topographical survey of closed power plant at Tanda, U.P. under NTPC. The aim was to prepare the existing plant and colony drawing before expansion by NTPC is taken up. The site was also a learning ground for our engineer with respect to plant survey.